Winery Info
Our new tasting room has been (somewhat) finished. The head
elf has always said 90% complete is when you move on to the next
pressing project and back to finishing the project when you have
time. Of course there never seems to be enough time. Anyway,
we will have our grand opening Saturday and Sunday the 4th and 5th
of September, 2010. Music, food, wine, cider - does it get any
better than this. Saturday will feature pigs and vino which
translates to a pig roast. Sunday is dogs and cider. We will have
free hot dogs, and cider samples
.
Fruit Tree Planting
The Elfs had a busy early spring. Last fall they had started
clearing the north side of the vineyard. Several trees and
numerous bushes were removed. The ground was dug and
cultivated to remove the bedrock and fieldstone. Field drain was
installed and the field was leveled, raked and further prepared.
Cherry trees and plum trees were planted the second week of April,
2010. These fruit trees will increase our ability to make
fruit wines as well as flavored ciders. It takes two to three
years to realize fruit from these trees. The orchard and
vineyard (as of this writing) are still pretty well bare and rough
looking. PLEASE EXCUSE OUR APPEARANCE DURING THIS TIME.
New Grape Planting
The head elf had decided to plant a new variety of cold hardy
grapes. In the fall he ordered three hundred Marquette vines as a
trial. This fairly new Minnesota grape has a Pinot Noir
ancestry has made some award winning wines in it's short existence.
The vines were ordered as potted plants instead of bare root to
allow for a later planting. The head elf had applied for a
USDA grant to install a high tunnel to study grape growing under
cover. Not sure of the grant he wanted to put off planting
time (June instead of May) as long as possible. On Friday,
April 23 the head elf received a call from Anne Marie from the local
NRSDS office and was notified that ELFS farm had received the grant.
The grant requires that Elfs Farm provide four years of data and
plant the same crop inside the tunnel as outside. We will keep
you posted of the study data.
The Hi - Tunnel should begin to be erected sometime in late August.
It is due to be shipped the first week of August and received by the
elfs a few days later.
